1. Understand the situation of UPS host and battery equipment first
The UPS host and lithium-ion battery are operating normally, but the service life of the UPS battery pack has exceeded its service life. In order to prevent the aging of lithium-ion batteries, the impact of relocation on the operation of the UPS host power supply system and the guarantee of UPS backup time.
2. Develop relocation plan
On site investigation → Communicate with Party A's technical personnel on site → Determine execution methods → Analyze equipment → Develop emergency methods. The process of lithium-ion battery UPS power supply is important based on the needs before relocation, and it is important to have a detailed understanding of the current system equipment situation and system operation. Develop detailed relocation methods and emergency response methods based on the understanding of the situation.
The engineer understands the current situation of the user's computer room and the specific requirements after relocation. Fully consider various situations that may arise during the execution process, customize a detailed and feasible migration execution plan, and minimize the impact of computer room migration work on users.
During the relocation process, UPS manufacturer's technical personnel should closely cooperate.
To ensure the smooth, orderly, and safe progress of the relocation work, a detailed relocation process will be developed, with detailed division of labor and specific work arrangements and responsibilities assigned to individuals.
3. Personnel organization and arrangement
The overall coordination of UPS battery relocation work is carried out by the computer room information center, with one overall commander appointed for the relocation work.
Read recommendations:
Coin Battery CR 2477
International lithium battery standard
Graphene battery technology principle.lithium battery energy storage Processing
402030 battery sales
3.7 volt battery 18650